Customization: | Available |
---|---|
Process: | Thermal Processing |
Power Source: | Electric |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Item | Inner tank | Jacket | Design date | ||
hydraulic test | full water test | 0.2 MPA | Item | Inner tank | Jacket |
1. Designed according to the relevant provisions of the food industry . 2. Meet safety operation system . 3. The inner tank should be hydraulically tested after fabrication 4. H ydraulically test of chloride ion must not be more than 25mg/L |
Working pressure | Normal | Normal | ||
Design pressure | Normal | Normal | |||
Working temp | Normal | Normal | |||
Design temp | Normal | Normal | |||
Working medium | Material | Heating oil | |||
Material | SUS304 | SUS304 | |||
Capacity | 300L | ||||
Heating power | 18Kw (6kw × 3pcs) | ||||
Agitator type | Frame agitator | ||||
Motor power | 0.75KW frequency control |
||||
Insulation | PURF |